KC Metal Fab
AUTOMATED BUS WASH
This has been the most ambitious project the shop has ever taken on, but here in the Industrial tech shop we love a challenge. This idea was pitched to Mr. Green and his students back in the fall of 2021 by our superindendant Mr. Turgeon. When everyone returned from Christmas break they started the R&D process to acess the feasability of such a project. Because as you can see throughout the slide show the onything we had was a wash bay to start with and the students along with guidance from Mr. Green designed, built, installed and tested the bus wash. Students were split into 3 groups to conduct research on what was already offered on the market. After doing this each group picked through their findings and compiled what they thought were the best features to design their individual unit. Then each group made their sales pitch to the superintendant and the bus mechanic. This went back and forth a few times before Mr. Turgeon and Joe the mechanic made their final decisions based on pricing and features offered by each group. Turns out they combined the best of the three sales pitches to settle on what they hope to have completed for the spring of 2025. Now you may be thinking wow 4 years to plan and complete is a long time, but we're usually booked out with projects a year and a half out. So from the time the idea was pitched we still had a shed to finish, the eagle trolley and the school store to build. Also we had a cedar strip canoe and a high top to build, instasll and paint for the art teachers camper van. So it wasn't until the fall of 2023 that we actually started building the mechanical room for the wash after school and on weekends because we were still putting the finishing touches on the school store. 
Throughout this project the students had to research and engineer the entire system. One group was in charge of the hydraulics of it for the pump, motor, hoses, nozzels and flow rates. Group 2 was in charge of the structural design of the trolley and rail system. Group 3 was in charge of the designing electrical systems such as motors needed, the PLC system, switches, touch screen and drawing of the schematics. 
After this was completed in the spring of 2022 Mr. Green started proofing the information and ordering parts to have on hand while students completed previously scheduled projects. But the fall of 2023 is when things started rolling with the mecahincal room going up and sweat soldering of the 2 inch water lines to supply the wash. The electrical class started in the spring of 2024 building the control panel that has all the connections for the inputs and outputs for the PLC (brain of the system). Not only did they have to build this but also program the PLC and the touch screen for the system they were building. By the end of the school year in 2024 we had components in place in the mechanical room and the control panel 75% complete.
When students returned in the fall of 2024 they started building the trolley system and Mr. Green was lucky enough to have an electrical student retake the class just so he could finish programming and installing the PLC cabinet. By christmas break of 2024 they hope to have they trolley and rails all instsalled and fine tuned, the PLC and touch screen all installed and functioning, and then be left to installing the limit switches, soap dispencer, and water lines after break.